INSTALLING 77 PONTOONS TO BUILD FLOATING PIER FOR ANA MARINA NHA TRANG JSC
PERFORMANCE SERVICE:
- CONNECT FLOATING PONTOONS TO EACH OTHER
- CONNECT FLOATING BRACKETS TO PIPE
- CONNECT FLOATING PONTOONS TO FLOATING PIPE BRACKETS
- CONNECTING PONTOONS TO PIERS
PROJECT VOLUMES:
- MANPOWER AND INSTALL ABOUT 1,000 M OF PONTOONS TO PIPES UNDER WATER.
PERFORMANCE TIME:
- PROJECT STARTED: 9th AUGUST, 2019.
- PROJECT ENDED: TO BE CONTINUED.





