INSTALLING 77 PONTOONS TO BUILD FLOATING PIER FOR ANA MARINA NHA TRANG JSC

INSTALLING 77 PONTOONS TO BUILD FLOATING PIER FOR ANA MARINA NHA TRANG JSC

PERFORMANCE SERVICE: 

  • CONNECT FLOATING PONTOONS TO EACH OTHER
  • CONNECT FLOATING BRACKETS TO PIPE
  • CONNECT FLOATING PONTOONS TO FLOATING PIPE BRACKETS
  • CONNECTING PONTOONS TO PIERS

PROJECT VOLUMES:

  • MANPOWER AND INSTALL ABOUT 1,000 M OF PONTOONS TO PIPES UNDER WATER.

PERFORMANCE TIME:

  • PROJECT STARTED: 9th AUGUST, 2019.
  • PROJECT ENDED: TO BE CONTINUED.