INTERNATIONAL TRANSPORT FOR WIND FARM PROJECTS FROM VIETNAM TO LAOS

International transport Vietnam – Laos wind power equipment for the Wind farm project in Savannakhet, Laos

Project: Savannakhet wind farm

Name, type of cargoQuantityDimensionL x W x H (m)Weighttons
  Drive train21       7.29 x 4.10 x 3.83101.00
  Wind blade23       84.05 x 5.09 x 3.8131.00
  Tower S23       18.79 x 5.00 x 5.12114.51
  Tower S31       19.91 x 4.99 x 5,12101.69
  Tower S424       25.23 x 4.98 x 5.1184.26

Volume: 72 sets oversized overweight cargoes

Transport route:

From Hon La port, Vietnam to Savannakhet, Laos

Distance route: 350km

Time performance:

Start: March 2025

Finish: Sep 2025